WEBVTT

00:00:00.000 --> 00:00:09.560
<v Host>Welcome back to Leaders Insights. Track Boeing's component data the way their regulators now

00:00:09.560 --> 00:00:14.520
<v Host>demand and why it matters this week. A single screw in an IKEA wardrobe comes in a labeled

00:00:14.520 --> 00:00:18.760
<v Host>bag with a part number and if it's missing you email them and get a replacement in a

00:00:18.760 --> 00:00:25.120
<v Host>week. A fastener holding together a 737 MAX has, until recently, had worse paperwork

00:00:25.120 --> 00:00:26.880
<v Host>than that flat pack bulb.

00:00:26.880 --> 00:00:31.760
<v Expert>And that's not a joke. That's a liability transfer. When a part goes into an aircraft

00:00:31.760 --> 00:00:36.360
<v Expert>without what the industry calls a birth record, the manufacturing history that says who made

00:00:36.360 --> 00:00:42.240
<v Expert>it, from which batch, on what machine. The regulator doesn't chase the tier 3 supplier

00:00:42.240 --> 00:00:47.480
<v Expert>who forged it. They land on the assembler. Boeing owns the defect the moment it can't

00:00:47.480 --> 00:00:48.480
<v Expert>prove otherwise.

00:00:48.480 --> 00:00:53.640
<v Host>So let's pull apart the actual thing they built. Boeing's traceability program. What's

00:00:53.640 --> 00:00:58.040
<v Host>the real artifact here? A system? A spreadsheet? What?

00:00:58.040 --> 00:01:03.400
<v Expert>It's a chain of custody stitched across roughly 12,000 suppliers. And the piece everyone points

00:01:03.400 --> 00:01:09.120
<v Expert>at is the digital genealogy record. One file per component that follows it from raw metal

00:01:09.120 --> 00:01:15.360
<v Expert>to installed part. On paper, elegant. In practice, three-quarters of the cost isn't

00:01:15.360 --> 00:01:20.560
<v Expert>the software. It's forcing a tier 3 machine shop in Wichita that still runs on paper

00:01:20.560 --> 00:01:23.520
<v Expert>travelers to emit clean structured data.

00:01:23.520 --> 00:01:24.840
<v Host>Where does that break?

00:01:24.840 --> 00:01:30.400
<v Expert>At the handoff, the part number Boeing expects. And the part number the supplier types are

00:01:30.400 --> 00:01:35.720
<v Expert>off by a character and the record orphans. Now you have a physical part with no valid

00:01:35.720 --> 00:01:42.280
<v Expert>genealogy. Multiply that by millions of line items and you get what DBT Labs, and I'll

00:01:42.280 --> 00:01:46.880
<v Expert>flag, they sell data pipeline tooling, so read their numbers as a sales deck until

00:01:46.880 --> 00:01:54.400
<v Expert>MIT Sloan confirms it. DBT calls the reconciliation tax, which they put around 30% of engineering

00:01:54.400 --> 00:01:58.720
<v Expert>hours spent just matching records that should have matched automatically.

00:01:58.720 --> 00:02:03.480
<v Host>You said read it as a sales deck. So what does the independent work actually show?

00:02:03.480 --> 00:02:08.320
<v Expert>MIT Sloan Management Review's manufacturing data studies put the honest figure lower on

00:02:08.320 --> 00:02:14.120
<v Expert>tooling and much higher on process. The bottleneck isn't the database. It's that nobody at

00:02:14.120 --> 00:02:18.760
<v Expert>the supplier is paid to care whether the record is clean because the penalty lands two

00:02:18.760 --> 00:02:22.240
<v Expert>tiers up. That's the part everyone gets wrong.

00:02:22.240 --> 00:02:25.560
<v Host>Spell that out. What's the consensus you think is dumb?

00:02:25.560 --> 00:02:31.960
<v Expert>The consensus is buy the traceability platform and you've solved traceability. No, you've

00:02:31.960 --> 00:02:36.720
<v Expert>bought a very expensive place to store your confusion. If the incentive structure means

00:02:36.720 --> 00:02:41.440
<v Expert>the supplier eats the cost of clean data, but the assembler eats the cost of dirty

00:02:41.440 --> 00:02:45.480
<v Expert>data, you've automated a lie with a nicer interface.

00:02:45.480 --> 00:02:47.960
<v Host>That's a strong claim. Back it.

00:02:47.960 --> 00:02:53.640
<v Expert>Boeing's own remediation timeline backs it. This wasn't a six-month software rollout.

00:02:53.640 --> 00:02:58.320
<v Expert>It's been a multi-year effort precisely because the hard part was contractual, rewriting

00:02:58.320 --> 00:03:03.200
<v Expert>supplier agreements so the tier three shop is paid for the record and penalized for

00:03:03.200 --> 00:03:09.760
<v Expert>a bad one. Once the money moved, the data got clean. Software didn't fix it. A clause

00:03:09.760 --> 00:03:10.760
<v Expert>fixed it.

00:03:10.760 --> 00:03:16.640
<v Host>Fine. But someone listening runs a mid-sized parts maker, not Boeing. What in this teardown

00:03:16.640 --> 00:03:18.680
<v Host>actually works that they should copy?

00:03:18.680 --> 00:03:23.680
<v Expert>The one genuinely good piece is the birth record as a single object, not a report you

00:03:23.680 --> 00:03:28.400
<v Expert>generate later. A record that's created the instant the part exists and travels with

00:03:28.400 --> 00:03:32.760
<v Expert>it. That's cheap to start, and it's the thing regulators now demand you produce

00:03:32.760 --> 00:03:35.440
<v Expert>on request within days, not months.

00:03:35.440 --> 00:03:39.200
<v Host>And what part of Boeing's approach should they absolutely not copy?

00:03:39.200 --> 00:03:45.440
<v Expert>The instinct to make it perfect across all 12,000 suppliers at once. Boeing had to, because

00:03:45.440 --> 00:03:52.360
<v Expert>a 737 is one system. A mid-sized shop doesn't. Start with the five parts that would sink

00:03:52.360 --> 00:03:57.160
<v Expert>you in a recall. Trace those end-to-end. Ignore the rest for now.

00:03:57.160 --> 00:04:02.440
<v Host>Last one. The cost of building this versus ignoring it. Give me the sentence.

00:04:02.440 --> 00:04:07.480
<v Expert>Building end-to-end traceability is a known painful number on a spreadsheet. Ignoring it

00:04:07.480 --> 00:04:12.560
<v Expert>is an unknown number that arrives the day a part fails, and you can't prove it wasn't

00:04:12.560 --> 00:04:16.280
<v Expert>yours. One you can budget. The other budgets you.

00:04:16.280 --> 00:04:21.200
<v Host>So the takeaway for a manufacturer this week? Pick your three most safety-critical parts

00:04:21.200 --> 00:04:27.080
<v Expert>and write the clause before you buy the software. Pay suppliers to deliver a clean birth record.

00:04:27.080 --> 00:04:31.480
<v Expert>Penalize them for a broken one. Get the incentive right, and the data follows for

00:04:31.480 --> 00:04:32.480
<v Expert>free.

00:04:32.480 --> 00:04:38.920
<v Host>This is for today's episode. Towards Data Science DDBT Labs, Vendor, Data Tooling, MIT Sloan

00:04:38.920 --> 00:04:44.800
<v Host>Management Review. Done. Want to know where you actually stand? Take the CDO self-assessment

00:04:44.800 --> 00:04:46.800
<v Host>at MBA-training.com.