Welcome to the Leaders Insights podcast.

00:00:07.920 --> 00:00:13.880
Today's episode, load forecasting for utility operators integrating weather, behavioral

00:00:13.880 --> 00:00:17.480
and DOR signals into demand prediction pipelines.

00:00:17.480 --> 00:00:20.760
Everyone in your field keeps saying load forecasting is a solved problem.

00:00:20.760 --> 00:00:23.040
You told me before we started, that's nonsense.

00:00:23.040 --> 00:00:24.040
Go.

00:00:24.040 --> 00:00:26.400
It was solved past tense.

00:00:26.400 --> 00:00:32.320
For 40 years the utility playbook was, temperature goes up, air conditioners turn on, demand

00:00:32.320 --> 00:00:33.600
climbs.

00:00:33.600 --> 00:00:38.720
You regress against weather and industrial schedules, and you're within 2%.

00:00:38.720 --> 00:00:43.200
That world is dead and a lot of forecasting teams haven't noticed the funeral.

00:00:43.200 --> 00:00:44.200
Dead how?

00:00:44.200 --> 00:00:45.680
Weather still drives demand.

00:00:45.680 --> 00:00:46.840
It does.

00:00:46.840 --> 00:00:49.160
But now half your grid fights back.

00:00:49.160 --> 00:00:54.040
Rooftop solar means a hot sunny afternoon can cut demand instead of raising it.

00:00:54.040 --> 00:00:55.920
The panels shave the peak.

00:00:55.920 --> 00:01:01.160
Then a cloud rolls over a neighborhood and 40 megawatts reappears in 90 seconds.

00:01:01.160 --> 00:01:04.360
Your old model sees weather and says, high demand.

00:01:04.360 --> 00:01:07.160
Reality says, actually no.

00:01:07.160 --> 00:01:11.120
The sign of the relationship flipped and nobody updated the equation.

00:01:11.120 --> 00:01:14.640
So the fix is just adding solar data to the pipeline.

00:01:14.640 --> 00:01:16.000
Problem solved again.

00:01:16.000 --> 00:01:18.440
That's exactly the mistake everyone makes.

00:01:18.440 --> 00:01:24.040
They bolt DR signals, distributed energy resources, meaning the solar panels, home

00:01:24.040 --> 00:01:28.600
batteries, and EV chargers sitting behind the meter, onto the same regression and call

00:01:28.600 --> 00:01:30.200
it modern.

00:01:30.200 --> 00:01:33.080
What they've built is a more complicated wrong answer.

00:01:33.080 --> 00:01:35.680
The behavior is the hard part, not the hardware.

00:01:35.680 --> 00:01:37.720
Explain the behavior part.

00:01:37.720 --> 00:01:39.440
Take EV charging.

00:01:39.440 --> 00:01:40.800
Electric vehicle charging.

00:01:40.800 --> 00:01:45.960
A utility in California assumes everyone plugs in at 6 p.m. when they get home.

00:01:45.960 --> 00:01:47.200
Fine.

00:01:47.200 --> 00:01:50.040
Then the utility offers a midnight rate discount.

00:01:50.040 --> 00:01:55.920
And suddenly 10,000 cars all start charging at 12 hours, zero minutes, and one second because

00:01:55.920 --> 00:01:57.840
they're on timers.

00:01:57.840 --> 00:02:02.160
You've engineered a synchronized spike that never existed in nature.

00:02:02.160 --> 00:02:07.800
Your forecast, trained on last year's behavior, has no idea the rate change even happened.

00:02:07.800 --> 00:02:11.360
That sounds like the utility shooting itself in the foot.

00:02:11.360 --> 00:02:12.360
Constantly.

00:02:12.360 --> 00:02:16.000
The price signal changes the thing you're trying to predict.

00:02:16.000 --> 00:02:18.020
Economists call that endogeneity.

00:02:18.020 --> 00:02:22.020
The variable you're measuring reacts to your own decisions.

00:02:22.020 --> 00:02:24.660
Most load models pretend the world holds still.

00:02:24.660 --> 00:02:25.660
It doesn't.

00:02:25.660 --> 00:02:27.980
Where does this actually cost money?

00:02:27.980 --> 00:02:29.380
Give me the pain.

00:02:29.380 --> 00:02:30.660
Two places.

00:02:30.660 --> 00:02:32.900
NERC reliability reports.

00:02:32.900 --> 00:02:36.260
That's the North American body that finds you when the lights flicker.

00:02:36.260 --> 00:02:40.700
And rate cases where regulators decide what you're allowed to charge.

00:02:40.700 --> 00:02:45.340
Under forecast the peak and you buy emergency power at 10 times the price.

00:02:45.340 --> 00:02:49.260
Or worse, you shed load and end up on the news.

00:02:49.260 --> 00:02:52.740
Over forecast and you've built a gas plant nobody needed.

00:02:52.740 --> 00:02:55.500
And the regulator makes shareholders eat it.

00:02:55.500 --> 00:02:59.780
Either direction, a 2% error, is now a nine-figure conversation.

00:02:59.780 --> 00:03:02.260
The vendors say their tooling fixes this.

00:03:02.260 --> 00:03:03.460
You buy that?

00:03:03.460 --> 00:03:04.460
Partly.

00:03:04.460 --> 00:03:11.460
DBB Labs, DWE, a data tooling vendor, publishes numbers on how much faster teams ship pipeline

00:03:11.460 --> 00:03:14.560
changes with proper version control.

00:03:14.560 --> 00:03:18.640
And it's genuinely useful for keeping these models auditable.

00:03:18.640 --> 00:03:21.800
But they sell the software, so cross-check it.

00:03:21.800 --> 00:03:24.440
The tooling helps you fix a model quickly.

00:03:24.440 --> 00:03:27.720
It does not tell you the model is wrong in the first place.

00:03:27.720 --> 00:03:30.560
That's a human problem wearing a software costume.

00:03:30.560 --> 00:03:34.000
So what does the independent research say people should do differently?

00:03:34.000 --> 00:03:39.680
MIT Technology Review had good reporting last year on probabilistic forecasting.

00:03:39.680 --> 00:03:44.500
Instead of predicting one demand number, you predict a range with confidence bands.

00:03:44.500 --> 00:03:51.380
As the honest answer on a partly cloudy day with high EV adoption isn't 4,200 megawatts.

00:03:51.380 --> 00:03:55.940
It's somewhere between 3,800 and 4,600.

00:03:55.940 --> 00:03:58.580
And I'm nervous.

00:03:58.580 --> 00:03:59.940
Operators hate that.

00:03:59.940 --> 00:04:02.340
They want a single number to plan against.

00:04:02.340 --> 00:04:04.500
But a range is harder to act on.

00:04:04.500 --> 00:04:06.420
Isn't the single number more useful?

00:04:06.420 --> 00:04:10.500
A confident wrong number is the most expensive thing in the building.

00:04:10.500 --> 00:04:15.060
The range tells you when to keep a reserve plant warm and when to relax.

00:04:15.060 --> 00:04:16.500
That's the whole game.

00:04:16.500 --> 00:04:18.420
Knowing your own uncertainty.

00:04:18.420 --> 00:04:20.180
The dry truth in one line?

00:04:20.180 --> 00:04:23.580
We spent 40 years teaching the grid to predict the weather.

00:04:23.580 --> 00:04:26.940
And then we filled every house with a robot that argues with it.

00:04:26.940 --> 00:04:30.120
Give me the one thing a forecasting team should do Monday morning.

00:04:30.120 --> 00:04:34.620
Go find every rate change and demand response program your company launched in the last

00:04:34.620 --> 00:04:36.440
18 months.

00:04:36.440 --> 00:04:40.020
Then check whether your model has any variable that reacts to them.

00:04:40.500 --> 00:04:45.780
If it doesn't, and it probably doesn't, your forecast isn't modeling the grid.

00:04:45.780 --> 00:04:48.900
It's modeling a grid that stopped existing years ago.

00:04:48.900 --> 00:04:50.500
Uncomfortable and useful.

00:04:50.500 --> 00:04:51.660
Thanks for coming in.

00:04:51.660 --> 00:04:53.620
Sources for today's episode.

00:04:53.620 --> 00:04:54.620
The new stack.

00:04:54.620 --> 00:04:56.620
MIT Technology Review.

00:04:56.620 --> 00:04:58.700
MIT Sloan Management Review.

00:04:58.700 --> 00:04:59.860
DBT Labs.

00:04:59.860 --> 00:05:00.860
Vendor.

00:05:00.860 --> 00:05:01.860
Data tooling.

00:05:01.860 --> 00:05:02.860
Done.

00:05:02.860 --> 00:05:04.580
Want to know where you actually stand?

00:05:04.580 --> 00:05:08.180
Take the CDO self-assessment at MBA-training.com.