<v Host>This is MBA Training. On the table: The same shift scores 73% or 85% OEE, and only the definitions changed.

00:00:15.490 --> 00:00:22.490
<v Host>How does a production line go from ordinary to world-class overnight without anyone touching a single machine?

00:00:22.490 --> 00:00:26.280
<v Expert>You change three words in a spreadsheet nobody reads.

00:00:26.280 --> 00:00:27.850
<v Host>Oh, come on.

00:00:27.850 --> 00:00:43.730
<v Expert>Genuinely. Same shift, same presses, same jams. One version of OEE, overall equipment effectiveness, the share of planned time that turns into good parts at full speed, says about seventy-three percent.

00:00:43.730 --> 00:00:45.040
<v Host>And the other version?

00:00:45.040 --> 00:00:53.400
<v Expert>Eighty-five. Which happens to be the old "world-class" mark from Nakajima, the guy who wrote the book on total productive maintenance.

00:00:53.400 --> 00:00:55.990
<v Host>Hang on. Same physical shift?

00:00:55.990 --> 00:01:00.430
<v Expert>Same everything. The only thing that moved was the paperwork.

00:01:00.430 --> 00:01:07.120
<v Host>Okay, I want to actually work this out, because "it's definitions" sounds like a consultant shrugging.

00:01:07.120 --> 00:01:09.890
<v Expert>Fair. Picture weighing yourself.

00:01:09.890 --> 00:01:10.960
<v Host>Thrilling.

00:01:10.960 --> 00:01:22.610
<v Expert>Monday you weigh in with your boots on, after lunch. Friday it's naked, before breakfast, one foot slightly off the scale. Congratulations, you lost a kilo.

00:01:22.610 --> 00:01:25.690
<v Host>That's my entire fitness strategy.

00:01:25.690 --> 00:01:38.860
<v Expert>That's most plants' OEE strategy. Three choices nobody signed off on. What counts as planned time, which cycle time is "ideal", and what counts as a good unit.

00:01:38.860 --> 00:01:42.100
<v Host>Start with planned time. Make it concrete.

00:01:42.100 --> 00:01:59.340
<v Expert>Changeovers. Swapping a mould, retooling for the next product. One camp, Vorne, who run OEE.com and sell monitoring, so they've got skin in it, says a changeover is a loss. You meant to be producing, you weren't.

00:01:59.340 --> 00:02:00.490
<v Host>And the other camp?

00:02:00.490 --> 00:02:10.940
<v Expert>Calls it "planned downtime" and quietly pulls it out of the denominator. Availability jumps. The loss is still there, it's just wearing a disguise.

00:02:10.940 --> 00:02:11.850
<v Host>Boots off.

00:02:11.850 --> 00:02:13.000
<v Expert>Boots off.

00:02:13.000 --> 00:02:23.190
<v Host>That's the first myth I want to fight, then. Everybody believes OEE disputes are measurement problems. Bad sensors, sloppy operators, wrong tags.

00:02:23.190 --> 00:02:26.900
<v Expert>Mostly wrong. Almost never the instrument.

00:02:26.900 --> 00:02:40.460
<v Host>I'm not fully buying that. There's that iFactory quote doing the rounds, a plant reporting seventy-something from manual shift logs, then the real number from the PLC... the machine controller... came in way lower.

00:02:40.460 --> 00:02:57.310
<v Expert>Right, and iFactory sells the thing that found the gap, so read it as a sales anecdote. But notice what actually changed there. A hand-logged plant ignores stops shorter than about five minutes. Automated capture catches far shorter ones.

00:02:57.310 --> 00:02:59.430
<v Host>So the jam exists either way.

00:02:59.430 --> 00:03:09.620
<v Expert>It just lands in a different bucket. At one site it's lost availability, at the sister site it's lost speed. Same jam, different crime scene.

00:03:09.620 --> 00:03:16.780
<v Host>Okay, so the myth's half true. Measurement does matter, but because measurement is a definition too.

00:03:16.780 --> 00:03:19.290
<v Expert>I'll take that. Grudgingly.

00:03:19.290 --> 00:03:35.560
<v Host>Quick aside, because this is the week for it. Fintech News Philippines covered CDOTrends' second Chief Digital and Data Officer Philippine Summit in Manila last week. The whole theme was the gap between what AI could do and what companies are actually getting out of it.

00:03:35.560 --> 00:03:38.800
<v Expert>Lots of agentic AI sessions, I'd guess.

00:03:38.800 --> 00:03:51.000
<v Host>Generative and agentic, yeah, AI that takes actions rather than just answering. And I kept thinking: a copilot sitting on top of plant data inherits every one of these ghosts.

00:03:51.000 --> 00:04:09.680
<v Expert>Worse, it makes them confident. At the dbt Summit this year, written up by dbt Labs, who sell the semantic layer they were pitching, so salt accordingly, two AWS architects showed an agent summing gross orders and overstating revenue by about thirty percent.

00:04:09.680 --> 00:04:12.110
<v Host>Revenue, though. Not factories.

00:04:12.110 --> 00:04:22.380
<v Expert>Ask it "which plant has the worst OEE" and it'll grab a column, apply whatever exclusion it finds, and announce a winner. With a straight face.

00:04:22.380 --> 00:04:25.620
<v Host>The intern who's never wrong.

00:04:25.620 --> 00:04:30.690
<v Expert>The intern who's never unsure. Different thing, much worse.

00:04:30.690 --> 00:04:35.440
<v Host>Second piece. Ideal cycle time. That sounds like the boring one.

00:04:35.440 --> 00:04:46.200
<v Expert>It's the sneakiest one. Ideal cycle time is the fastest a machine can theoretically make one part. Nameplate, what the builder designed it for.

00:04:46.200 --> 00:04:47.920
<v Host>And plants don't use that.

00:04:47.920 --> 00:05:03.150
<v Expert>Plants with ageing presses often swap in the standard rate from the routing, the recipe that says which machine makes what. That's the rate finance uses to cost the product. Feels respectable. It's a budget number pretending to be physics.

00:05:03.150 --> 00:05:06.080
<v Host>So performance jumps and nobody lied.

00:05:06.080 --> 00:05:12.270
<v Expert>Nobody lied, nobody logged it, and the press is exactly as tired as it was yesterday.

00:05:12.270 --> 00:05:16.630
<v Host>Third. Good unit. Surely a good part is a good part.

00:05:16.630 --> 00:05:31.470
<v Expert>Surely. Count at the station's first inspection and anything reworked is a quality loss. Count at the ERP goods receipt, the enterprise system booking stock in, and the reworked parts arrive looking pristine.

00:05:31.470 --> 00:05:32.540
<v Host>Laundered.

00:05:32.540 --> 00:05:44.190
<v Expert>And in pharma or automotive that's not cosmetic. Your batch records already say the part needed rework. An OEE figure that hides it contradicts your own quality system.

00:05:44.190 --> 00:05:47.040
<v Host>Put the three together for me. Slowly.

00:05:47.040 --> 00:06:07.390
<v Expert>Corporate counts changeovers as loss, uses nameplate, counts first pass. Seventy-three-ish. The plant moves changeover into planned time, nudges up a couple of points. The line then uses the costing rate and counts reworked parts as good, and suddenly it's flirting with world-class.

00:06:07.390 --> 00:06:12.300
<v Host>And that's a separate myth, right? That a higher OEE means a better plant.

00:06:12.300 --> 00:06:27.450
<v Expert>That one costs real money. The plant with inflated OEE doesn't get the maintenance budget it needs. The plant that looks weak gets a second line approved, when its missing capacity was really leaking out through unlogged micro-stops.

00:06:27.450 --> 00:06:35.890
<v Host>That one bothers me. Somebody signs off a whole new line, hires for it, and the actual problem was a jam nobody wrote down.

00:06:35.890 --> 00:06:48.720
<v Expert>And in unionised plants where OEE feeds gainsharing, bonuses tied to performance, a definition change is a pay change. People's money moves because someone edited an Excel macro.

00:06:48.720 --> 00:06:54.990
<v Host>Right. So who owns this? Because my instinct says operations. They run the floor.

00:06:54.990 --> 00:07:08.470
<v Expert>The chief data officer. These three inputs are master data, governed reference data, same as a product code. Ideal cycle time is literally a field per product per machine.

00:07:08.470 --> 00:07:17.560
<v Host>Here's where I push. A CDO walks into a plant and tells a forty-year production manager what a changeover is? He'll get eaten alive.

00:07:17.560 --> 00:07:25.760
<v Expert>He's not defining the changeover. He's making sure whoever defines it signs their name, versions it, and it can't drift.

00:07:25.760 --> 00:07:27.410
<v Host>That's a governance clerk.

00:07:27.410 --> 00:07:31.770
<v Expert>That's the only person in the building with no bonus riding on the answer.

00:07:31.770 --> 00:07:37.100
<v Host>Hm. Okay, that's a decent line. I still think the plant should hold the pen.

00:07:37.100 --> 00:07:40.420
<v Expert>Hold the pen, fine. Not the eraser.

00:07:40.420 --> 00:07:48.620
<v Host>We're not settling that. Third myth, and this is mine: one standard OEE across the group is always better.

00:07:48.620 --> 00:08:08.580
<v Expert>Mostly true, actually, when it's like with like. Hutchinson, the automotive supplier, standardised on the ISO standard for manufacturing KPIs across dozens of sites in multiple countries and reported a huge climb. Though those are TeepTrak's numbers, and TeepTrak sold the sensors.

00:08:08.580 --> 00:08:11.350
<v Host>Everyone in this story sells the sensors.

00:08:11.350 --> 00:08:26.660
<v Expert>It's sensors all the way down. There's an independent one, a peer-reviewed MDPI study of an injection moulding plant, big improvement, and the losses were downtime and slow cycle times. Exactly the two factors that drift.

00:08:26.660 --> 00:08:34.550
<v Host>But take a pharma line with mandated cleaning, or a job shop changing over every hour. One number makes them look like failures.

00:08:34.550 --> 00:08:45.940
<v Expert>Agreed there. Benchmarking a changeover-heavy job shop against Nakajima is a category error. Compare loss trees, the breakdown of where the minutes went, not the headline.

00:08:45.940 --> 00:08:47.980
<v Host>So you'd give them an exemption.

00:08:47.980 --> 00:08:55.950
<v Expert>A named variant. "OEE-local, changeover excluded." It never gets to steal the real name.

00:08:55.950 --> 00:08:59.190
<v Host>That feels like a compromise dressed as a rule.

00:08:59.190 --> 00:09:02.980
<v Expert>It's a rule with an escape hatch that's painted bright orange.

00:09:02.980 --> 00:09:06.060
<v Host>What's the actual test, though? Where's the line?

00:09:06.060 --> 00:09:27.450
<v Expert>If anyone on site could have decided otherwise, it's a loss. Only what nobody on site could change leaves the denominator. No customer demand, legally mandated cleaning, contractual meal breaks, out. Changeovers, warm-ups, waiting for material, maintenance you scheduled yourself, all losses.

00:09:27.450 --> 00:09:32.360
<v Host>Brutal. And the moment you switch to that, every plant's number drops.

00:09:32.360 --> 00:09:41.530
<v Expert>With nothing changing on the floor. If managers are paid on the old figure, they'll fight it to the death, and honestly, they'd be right to.

00:09:41.530 --> 00:09:44.770
<v Host>So the definition fight is really a pay fight.

00:09:44.770 --> 00:09:50.490
<v Expert>Always was. Rebaseline the incentives the same day, or the whole thing's theatre.

00:09:50.490 --> 00:09:54.930
<v Host>One more. Averaging OEE across a whole factory.

00:09:54.930 --> 00:10:08.570
<v Expert>FlowFuse, another vendor, says it produces a meaningless number, and they're right. Average a bottleneck with a machine that idles half the day and you get soup. The constraint line is the one that matters.

00:10:08.570 --> 00:10:10.290
<v Host>And long-range capacity?

00:10:10.290 --> 00:10:22.720
<v Expert>Wrong ratio entirely. TEEP, total effective equipment performance, uses the whole calendar week, so it shows capacity sitting in shifts you never scheduled.

00:10:22.720 --> 00:10:30.030
<v Host>What strikes me is how unglamorous the fix is. No new dashboard. Just writing down where the changeover lives.

00:10:30.030 --> 00:10:35.670
<v Expert>A dashboard only shows whatever definitions it was fed. Prettier boots.

00:10:35.670 --> 00:10:38.440
<v Host>Boots on, boots off.

00:10:38.440 --> 00:10:46.150
<v Expert>Most groups have three versions of reality for the same line, the same week, and three people defending them in the ops review.

00:10:46.150 --> 00:10:48.270
<v Host>And the copilot makes it four.

00:10:48.270 --> 00:10:52.060
<v Expert>The copilot picks one at random and calls it insight.

00:10:52.060 --> 00:11:04.260
<v Host>So the uncomfortable bit is this. Somewhere tonight a plant is being ranked, a bonus is being set, maybe a new line is being approved, on a number that changed meaning and nobody noticed.

00:11:04.260 --> 00:11:06.770
<v Expert>Possibly by the person approving it.

00:11:06.770 --> 00:11:13.380
<v Host>Which leaves me wondering what else we measure every week that's really just a decision someone forgot they made.

00:11:13.380 --> 00:11:17.980
<v Host>Drawn from Oee, Dawiso and Teeptrak, links in the show notes.

00:11:17.980 --> 00:11:24.330
<v Host>Done for today. There's a new CDO deep dive every week at mba-training.com.